Balcony inspection deadlines

What happens if you ignore a deck or balcony inspection?

The short answer: liability if someone gets hurt, daily penalties and a lien for apartment owners, and a property that is harder to sell. California requires inspections of elevated balconies, decks, stairs and walkways on buildings with three or more units. Apartments follow SB 721 every 6 years. Condos and HOAs follow SB 326 every 9 years. San Francisco adds Section 604 every 6 years. Skipping it is not a paperwork problem. Here is what is at stake.

1. You are liable if someone gets hurt

A deck does not fail overnight. Rot, water damage and tired connections build up for years, often where nobody can see them. If a tenant, a guest or a family member is hurt on a balcony you were required to inspect and did not, your legal exposure is serious.

An inspection report is your written proof that you did what the law asks. Without one, you have nothing to show.

2. Penalties and a lien on the property

Under SB 721 (Health and Safety Code 17973), apartment buildings with three or more units must have their elevated elements inspected. The first deadline was January 1, 2026, and then every 6 years.

If an owner does not make the required repairs in time, the city can:

  • Send a corrective notice.
  • Charge a civil penalty for every day the building stays out of compliance.
  • Record a building safety lien on the property.

In San Francisco, Section 604 of the Housing Code adds its own inspection, with an affidavit filed with the Department of Building Inspection every 6 years. It has its own enforcement, separate from state law.

3. It is harder to sell

This one surprises owners the most. When a condo sells, the seller must give the buyer a copy of the most recent SB 326 inspection report (Civil Code 4525). A buyer's agent will ask for it. A missing report slows escrow.

For apartment buildings, lenders and buyers ask for proof of compliance too. An uninspected building is a risk on paper, and buyers price it that way, or walk.

4. Small problems turn into big ones

An inspection catches problems early: a soft ledger board, a joist that is starting to rot, water getting in at the door threshold. Caught early, that is a repair. Left alone, it becomes a full replacement.

5. An emergency finding starts the clock

If I find a condition that is an immediate threat to safety, I call you right away. The law requires the report to go to you and to the city within 15 days, and you must act at once, for example by keeping people off the balcony until it is fixed.

Owners who never schedule an inspection get no early warning. Their first notice may come from the city, not from an engineer they chose.

6. The duty is yours, not the inspector's

The law puts it on the owner, or on the HOA board for condos: arrange the inspection, make the repairs on time, and keep the records from one cycle to the next. I document what is there and tell you plainly what must be fixed to pass. What happens next is your call.

The inspection is the cheap option

An inspection costs a small part of what one injury claim, one enforcement case or one failed escrow costs. If your building has not been inspected, or the next cycle is coming, act before a problem shows up.

Not sure where your building stands? Give me the address. I check which law applies and when it is due, for free. I inspect only. I do not build or repair, so I have nothing to sell you but the inspection.

Questions owners ask

What happens if I miss my SB 721 deadline?

The city can send you a corrective notice. If repairs are not done in time, it can charge a daily civil penalty and record a building safety lien on the property.

Is there a fine for missing an SB 326 inspection?

SB 326 has no daily fine like SB 721. The risk for an HOA board is liability: negligence and fiduciary duty claims if someone is hurt, and a missing report when an owner tries to sell.

Can I sell a condo without the SB 326 report?

The seller must give the buyer a copy of the most recent SB 326 report. A missing report slows escrow and gives the buyer a reason to walk or renegotiate.

What if the inspection finds an immediate danger?

I call you right away. The law requires the report to go to you and to the city within 15 days, and you must act at once, for example by closing off the balcony until it is repaired.

Who is responsible, me or the inspector?

You are. The owner or the HOA board arranges the inspection and makes the repairs. I document what is there and tell you plainly what must be fixed to pass.

Do not find out at escrow.

Give me your address. I watch the deadlines for free.

Check my building, free
Call 415 407 4640 Check my building, free